- Cut out new 3/4" thick plywood companion way board to replace top board that has delaminated. Was coated with epoxy without glass.
- Cut out new 3/4" thick plywood icebox shelf to replace 3/8" or 1/2" shelf that became saturated. Was coated with epoxy without glass.
- Removed tall, thin fiddles from icebox top. Installed on front and port sides teak molding that matches the galley. Front fiddle secured with two #8 1-1/2" screws. The third screw hole is under the sside deck, will have to see if I can drill the hole using a right-angle attachment. Port side fiddle secured using hot glue due to being located under the side deck and so not drillable.