- Installed drain plug in head.
- Repositioned port spring line to remove worn section from service.
- Removed signal halyard. Stored in hanging locker.
- Washed decks vigorously. Lots of gree...either algae or pollen removed.
- Lead halyards back to cockpit.
- Installed mainsheet and vang. Only remaining line is spinnaker downhaul.
- Bent on mainsail. Rove first reefing line. Installed battens. Raised and lowered to check operation.